A realistic pathway for coalfired power in China from 2020 to 2030
Construct a coalfired power installation on the supply side end to meet a peak load of less than 50100 h is the most uneconomical approach, and such an approach will also further exacerbate overcapacity and economic deterioration of coalfired power. Therefore, greatly enhancing the demand side management level during the process of power ...